Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 午夜国产大片免费观看 | 最猛91大神ben与女教师 | 成人午夜大片免费看爽爽爽 | 成人在线综合网 | 男女草逼视频 | 人人公开免费超级碰碰碰视频 | 高h细节肉爽文bl1v1 | 久久久久无码国产精品一区 | 国产色在线 | 亚洲 国产色综合天天综合网 | 中文字幕在线看视频一区二区三区 | 三级理论在线播放大全 | 91在线网 | 97色偷偷| 成年人啪啪网站 | 午夜免费的国产片在线观看 | 欧美色图在线观看 | 欧美18videosex性欧美69 | 丁香网五月天 | 狠狠色噜噜狠狠狠狠五月婷 | 天堂在线天堂最新版在线www | 亚洲国产成人精品久久 | 海棠高h粗暴调教双性男男 韩国韩宝贝2020vip福利视频 | 狠狠色丁香婷婷综合激情 | 兔费看全黄三级 | 天天色影院 | 天天舔天天色 | 黄色大片毛片 | 日本黄色一区 | 精品欧美激情在线看 | 美女被羞羞产奶视频网站 | 黄 色 免费网 站 成 人 | 色偷偷综合网 | a男人的天堂久久a毛片 | 国产乱码精品一区二区三区四川人 | 久久精品影视 | 天天躁夜夜躁狠狠躁2024 | 欧美一区二区三区激情啪啪 | 日本黄色高清视频 | vvvv98国产成人综合青青 | 在线天堂中文新版www | 九九热九九 |