色精品一区二区三区-色久阁-色久影院-色久综合大榴莲-国产成人精品亚洲一区-国产成人精品一区

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 伊人久久大| 日本片巨大的乳456线观看| 成人三级毛片| 亚洲羞羞裸色私人影院| 天天做天天爱天天大综合| 天天操天天搞| 大香线蕉97久久| 91精品国产亚洲爽啪在线影院 | 久草在线免费资源站| 亚洲最色网| 免费伦费一区二区三区四区| 伊人最新网址| 色偷偷男人天堂| 久久精品成人免费网站| www.黄网站| 片免费观看在线看| 国产性videostv另类极品| 黄视频免费观看| 色综合天天射| 久久三级国产| 最近视频在线播放免费观看| 奇米888在线看奇米999| 激情欧美在线| 中文字幕天堂| 日本aaaa级片| 国产成人一区二区在线不卡| 天天操欧美| 丁香激情六月| 五月婷婷久久综合| 精品国产三级在线观看| 手机看片自拍自拍自拍| 中文字幕一区二区三区四区五区 | 亚洲三级网址| 欧美爽爽| 伊人狼人综合| 国产福利免费观看| jizz免费一区二区三区| 日本黄色一级大片| 午夜网站在线播放| 91国内视频| 色香色香欲天天天影视综合网|